Hayes Data Centre
Date: 2007
Location: Hayes Middlesex
Project: Data Centre
Sector: Banking
End Client: Large Merchant Bank
Project Team Principles:
Cundall / ISG / MJ Lonsdale
Value: >£100k
System: Trend IQ2/963
Control I/O: 150+
Panels: 1 MCC, 12 Monitoring Panels
Plant / Services:
Standby Generators
Electrical Switchgear
Static UPS
Pod Cooling AHU’s
CRAC Units (DX Close Control)
General Supply / Extract AHU’s
Notable / Special Features:
Very Fast Track Project,
Design and Build Type Project,
Existing Critical Services Maintained Throughout Project
Project Overview:
The data centre was provided to the end client by a multi-disciplinary project team, working within a very fast track project brief.
Orlanix developed, designed, installed, and commissioned, the Building Management System for the main IT data suite, and associated roof plant areas; based on the requirements of the project performance specification, ongoing design changes, and enhancements.
The primary function of the BMS is to monitor the buildings critical power, environmental, and life safety, systems.
In addition the BMS carries out control functionality for a number of environmental systems; such as fresh air supply, and extract, and provides basic control interfaces with a number of buildings OEM control systems. |